iGeo 2017, Теренна работа — Задача 4. II. Transportation and Accessibility
14th International Geography Olympiad — Fieldwork Exercise 2 — Sustainable development of youth tourism at Košutnjak Park of Belgrade, Serbia · 3 т.
Внимание: Бележка към темата
The tasks refer to Table 1 and Maps 4, 5 and 6 of a separate Resource Booklet, which is not part of this document.
Указания
All tasks must be completed individually, using the answer templates provided.
The Resource Booklet contains important supporting materials: tables with statistical data, maps, etc.
Time management:
You have 10 minutes to read the tasks and Resource Booklet. No writing during this time.
Students with English as the language of instruction then have 2 hours to complete the test.
All other students have 2 hours and 20 minutes.
Write your answers in pen.
You may use colored pencils/pens for map work.
You may refer to material in the Resource Booklet in your answers, and you may use material included in earlier answers to the FWE-1 you have provided.
Total marks for FWE-2: 20
Условие
II.2. There is a plan to build a tunnel for cars in Belgrade from A to B (Map 4). Provide positive justifications (benefits) for building this tunnel for future development of tourism in Košutnjak Park. (2 m)
Propose the shortest way to connect the Aleksandar restaurant at Košutnjak Park (Stop S4, where you were yesterday), with the exit from the proposed tunnel (B on Map 4). Be realistic: only kinds of transport, which are already used for passengers in the other cities of the world, can be proposed. Name this kind of public transport and estimate the length of its route from the tunnel exit to S4. (1 m)
______________________ (mode of transportation)
Length of line ____________ m
Решение
Внимание: Непълно решение
В архива няма официално решение на тази задача.
Оригинал в Архива: FIELDWORK 2.pdf